Protection Studies & Settings Calculation
Short-circuit, coordination and relay settings calculations with a documented basis your engineers can review.
Scope, inputs and boundariesRelevant when
- The network has changed since settings were last calculated.
- Trips have been non-selective or difficult to explain.
- New equipment or a new installation needs settings.
- Existing settings have no documented basis.
Advice & review outputsEngineering deliverables
- Settings criteria and protection philosophy review
- Independent review of existing settings
- Review of disturbance and event records you provide
- Review of third-party study reports
- Short-circuit and coordination study report
- Relay settings schedule with calculation references
- Time–current coordination plots
- Manufacturer-native settings files, where the platform, tools and scope allow